“Project 18 Hickory” – 2025

  • Site clean-up of all debris
  • Site Grading & Leveling
  • Trees Trimmed per Firewise Standards.
  • New Septic System Installed
  • 1500 Gallon Cistern Installed w/ Pad
  • 150 Gallon Propane Tank Installed w/ Pad
  • NEC On-Grid Power Pole and Power Service Installed
  • Full Site 4′ T-Post Fencing, including 12′ Gate.
  • Gravel Driveway Graded and Installed