“Project 18 Hickory” – 2025
- Site clean-up of all debris
- Site Grading & Leveling
- Trees Trimmed per Firewise Standards.
- New Septic System Installed
- 1500 Gallon Cistern Installed w/ Pad
- 150 Gallon Propane Tank Installed w/ Pad
- NEC On-Grid Power Pole and Power Service Installed
- Full Site 4′ T-Post Fencing, including 12′ Gate.
- Gravel Driveway Graded and Installed
Before




After