Timeline: 3–6 Months Perimeter Security: 1-acre welded wire fencing with a 12-foot metal access gate. Site Preparation: Complete parcel clearing, debris removal, and professional grading. Fire Mitigation: All trees trimmed and cleared to meet Firewise standards. Water & Fuel: 1,550-gallon water cistern installed on a prepared gravel pad, plus an on-site propane tank. Waste Management: Fully installed 3-bedroom, 2-bathroom septic system (perc report included). Power: On-grid power connected and active (APS / Navopache). Contact (Koda Hollow) Timeline: 1–2 Months Perimeter Security: 1-acre welded wire fencing with a 12-foot metal access gate. Site Preparation: Complete parcel clearing, debris removal, and professional grading.t Item Fire Mitigation: All trees trimmed and cleared to meet Firewise standards. Water & Fuel: 1,550-gallon water cistern installed on a prepared gravel pad, plus an on-site propane tank. Waste Management: Passed perc test completed; parcel is septic-system ready. Power: On-grid power available at the site (ready for connection following septic installation). Contact (Koda Hollow) Timeline: 30 Days Perimeter Security: 1-acre welded wire fencing with a 12-foot metal access gate. Site Preparation: Complete parcel clearing, debris removal, and professional grading. Fire Mitigation: All trees trimmed and cleared to meet Firewise standards. (Note: This tier does not include a cistern, propane tank, or perc testing). Contact (Koda Hollow) Fee: $500 (Fully credited toward your development contract) A comprehensive ground-level evaluation of your parcel before breaking ground. Topographical Review: Evaluation of current parcel grade and leveling needs. Boundary & Fencing: Setting of general fencing stakes and property boundary markers. Forestry Evaluation: Assessment of current tree health and Firewise mitigation requirements. Data Verification: On-site verification against satellite mapping to ensure precise development planning. Contact (Koda Hollow)